GBT Daily Summary for Wed Jan 2, 2002
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift: 0700-1900 Operator: Dave Rose
o 0800-1630 Maintenance/Outfitting:
Install new servo lockout system
Cryo pumps inspection
Install final section of track covers
o 1630-1900 Commissioning (Langston, 1.42/22.2 GHz)
Night Shift: 1900-0700 Operator: Donna Stricklin
o 1900-2000 Commissioning (Langston, 1.42/22.2 GHz)
o 2000-0700 Commissioning (Galaxy Survey, 1420 MHz)
J. Lawrence 01/03/02