GBT Daily Summary for Wed Dec 19, 2001
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift: 0700-1900 Operator: Kevin Gum
o 0800-1630 Maintenance/Outfitting:
Extend cables in servo room
Holography receiver checkout
Welding at feedarm
Checkout signal switching distribution system
o 1630-1730 Commissioning (Langston, 12178 MHz)
o 1730-1900 Commissioning (Maddelena, 12 GHz)
Night Shift: 1900-0700 Operator: Dave Rose
o 1900-2000 Commissioning (Maddelena, 12 GHz)Commissioning (Holography
setup/tests)
o 2000-2045 Commissioning (Fisher, Galaxy Survey, 1420 MHz)
o 2045-0015 Commissioning (Langston, 12178 MHz)
o 0015-0700 Commissioning (Fisher, Galaxy Survey, 1420 MHz)
J. Lawrence 12/20/01