GBT Daily Summary for Mon Dec 10, 2001
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift: 0700-1900 Operator: Greg Monk
o 0800-1630 Maintenance/Outfitting:
Phase cal generator
Painting on Alidade lvl 2
Servo room listening stations and UPS
Holography receiver cable installed
Truck 1 potentiometer checked out
Azimuth brake torque testing
o 1630-1900 Commissioning (Fisher, Galaxy Survey, 1420 MHz)
Night Shift: 1900-0700 Operator: Donna Stricklin
o 1900-0700 Commissioning (Fisher, Galaxy Survey, 1420 MHz)
J. Lawrence 12/11/01