Day Shift 0700-1900 Operator: Donna Stricklin
o 0800-1630 Maintenance/Outfitting:
Oil pump on PF1 receiver installed
Continued work warehouse walkway
Work on vehicle plug-ins
o 1630-1700 Not Scheduled
o 1700-1940 Laser Tests
Night Shift: 1900-0700 Operator: Dave Rose
o 1940-2130 Commissioning (Ghigo, 8.4 GHz)
o 2130-0230 Commissioning (Tim Hankins, 1.36 GHz)
o 1230-0700 Not Scheduled
J. Lawrence 11/15/01