GBT Daily Summary for Tue Oct 16, 2001
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift 0700-1900 Operator: Bill Campbell
o 0800-1730 Maintenance/Outfitting:
HVAC maintenance-valve replaced in chiller line
Concrete foundation work- warehouse to telescope
Cable pulled for weather station
Filter connectors installed in receiver room
Seal replaced in Y3 subreflector actuator
ZX113 platform drilled to drain water
o 1730-1900 System down, restarted to support commissioning
Night Shift: 1900-0700 Operator: Eric Knapp
o 1900-0700 Commissioning (Langston/Hankins, 8600 MHz)
J. Lawrence 10/17/01