GBT Daily Summary for Fri Sep 21, 2001
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift 0700-1900 Operator: Eric Knapp
o 0800-1630 Maintenance/Outfitting:
S-Band receiver installed
Servo room air handler checked out
Anemometer brackets installed
Compression fittings in hoist feed box installed
Refrigerator changed out
Servo control boards modified to inhibit computer generated hard
stops
o 1800-1940 Commissioning (Ghigo-2200 MHz)
Night Shift: 1900-0700 Operator: Bill Campbell
o 1900-0700 Commissioning (Langston 1516 MHz)
J. Lawrence 10/16/01