GBT Daily Summary for Wed Aug 29, 2001

Past Summaries   Current Daily Summary  
GB Home Page   GB Telescope Operations Home Page  


Day Shift 0700-1900     Operator:  Donna Stricklin

o  0800-1630 Maintenance/ Outfitting:
              Work on Turret Stow pin switch
              L-Band/KU-Band feeds installed
              Fiber optic terminations continued     

o   1730-1900  Commissioning (9.8 GHz- Langston)   

Night Shift: 1900-0700  Operator: Bill Campbell

o  1900-2100 Commissioning (9.8 GHz- Langston) 
   2100-2250 Laser Testing (Parker)
   2250-0700 Commissioning (9.8 GHz- Langston)
J. Lawrence 10/16/01