GBT Daily Summary for Wed Aug 29, 2001
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift 0700-1900 Operator: Donna Stricklin
o 0800-1630 Maintenance/ Outfitting:
Work on Turret Stow pin switch
L-Band/KU-Band feeds installed
Fiber optic terminations continued
o 1730-1900 Commissioning (9.8 GHz- Langston)
Night Shift: 1900-0700 Operator: Bill Campbell
o 1900-2100 Commissioning (9.8 GHz- Langston)
2100-2250 Laser Testing (Parker)
2250-0700 Commissioning (9.8 GHz- Langston)
J. Lawrence 10/16/01