GBT Daily Summary for Tue Aug 28, 2001

Past Summaries   Current Daily Summary  
GB Home Page   GB Telescope Operations Home Page  


Day Shift 0700-1900     Operator:  Eric Knapp
 
o  0800-1500 Maintenance/ Outfitting:
              Worked on Holography RCVR Temp control
              Daily walk through inspections.
              Work continued on Pubic Address/listening station cabling 
              Azimuth brake tests 
              Fiber optic connectors installed 
              
             
Night Shift: 1900-0700  Operator: Bill Campbell

o  1900-0700 Commissioning (2 GHz- Balser)