GBT Daily Summary for Fri Aug 24, 2001
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift 0700-1900 Operator: Greg Monk
o 0800-1600 Outfitting/Maintenance:
Actuator Waterproofing
PA system installation
Phone line installation
Surveying Level 4
Daily walk through inspections.
o 1600-1900 Set up for commissioning, turret stow pin not working
properly, resolveded with use of the Portable Maintenance Unit(PMU)
Night Shift: 1900-0700 Operator: Donna Stricklin
o 1900-0700 Commissioning (10 GHz- Ghigo)
J. Lawrence 10/16/01