GBT Daily Summary for Thu Aug 23, 2001
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift 0700-1900 Operator: Greg Monk
o 0800-1500 Maintenance/ Outfitting:
Alidade elevator door interlock switch replaced
Daily walk through inspections.
Work continued on Pubic Address/listening station cabling
Landscaping/hauling/trash pickup
o 1700-1900 Commissioning (800 MHz- Maddelena)
Night Shift: 1900-0700 Operator: Donna Stricklin
o 1900-0700 Commissioning (800 MHz- Maddelena)
J. Lawrence 10/16/01