GBT Daily Summary for Thu Aug 23, 2001

Past Summaries   Current Daily Summary  
GB Home Page   GB Telescope Operations Home Page  


Day Shift 0700-1900     Operator:  Greg Monk
 
o  0800-1500 Maintenance/ Outfitting:
              Alidade elevator door interlock switch replaced
              Daily walk through inspections.
              Work continued on Pubic Address/listening station cabling 
              Landscaping/hauling/trash pickup
              
o  1700-1900 Commissioning (800 MHz- Maddelena)
             
Night Shift: 1900-0700  Operator: Donna Stricklin

o  1900-0700 Commissioning (800 MHz- Maddelena)
J. Lawrence 10/16/01