GBT Daily Summary for Tue Aug 21, 2001
Past Summaries
Current Daily Summary
GB Home Page
GB Telescope Operations Home Page
Day Shift 0700-1900 Operator: Donna Stricklin
o 0800-1500 Maintenance/Outfitting:
Replaced feed arm elevator cable sheave rollers
Removed ballast from cable sheave to correct side imbalance
Replaced two aircraft warning lamps, #4 has a broken lense
(ordering spares)
assembly rollers.(need modification)
B hoist maintenance- waiting on parts
L-band receiver experiencing noise in both channels- refrigerator
modulation- will be scheduled to come down
Daily walk through inspections.
Pulled more Pubic Address cables
Continued terminating fibers at boom
AZ/EL limit switches checked out
Actuator room grounding
o 1600-1900 Science (1.47 GHz- Jacoby)
Night Shift: 1900-0700 Operator: Dave Rose
o 1900-0100 Science (1.47 GHz- Jacoby)
J. Lawrence 10/16/01