GBT Schedule for September 2002

09/30/2002 11:59:03

The Day number is the Eastern time day number for this month. The times refer to eastern time zone hours.

Jump to Schedules Page     GB Home Page     GBT Home Page     GBT Web Calendar

1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Sunday   Friend Fe/Be
00:00 - 02:40 A Lockman, F. J. L/SPD
02:40 - 12:55 T Tests of OTF Mapping - Lockman   L/ 
12:55 - 16:55 T Tests of LO blanking in Spectrometer - Ghigo    / 
16:55 - 17:55 S Setup for GBT02B-009   L/P
17:55 - 19:55 A Balser, D. L/P
19:55 - 20:55 S Setup for GBT02A-003   L/S
20:55 - 24:00 A Ghigo, F. D. L/S
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Monday   Friend Fe/Be
00:00 - 00:05 A Ghigo, F. D. L/S
00:05 - 14:05 T Tests Low Freq - Roshi   6/ 
14:05 - 15:05 S Setup for GBT02B-009   L/P
15:05 - 24:00 A Balser, D. L/P
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Tuesday   Friend Fe/Be
00:00 - 00:00 A Balser, D. L/P
00:00 - 02:30 T Tests Low Freq - Rosh   6/ 
02:30 - 07:00 T Tests Low Freq - Roshi   6/ 
07:00 - 18:30 M Maintenance    / 
18:30 - 20:30 A Balser, D. L/P
20:30 - 24:00 T Tests of Spectrometer modes - Hogg    / 
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Wednesday   Friend Fe/Be
00:00 - 07:00 T Tests of Spectrometer modes - Hogg    / 
07:00 - 18:25 M Maintenance    / 
18:25 - 20:25 A Balser, D. L/P
20:25 - 21:25 S Setup for GBT02C-023   L/SPD
21:25 - 24:00 A Lockman, F. J. L/SPD
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Thursday   Friend Fe/Be
00:00 - 02:25 A Lockman, F. J. L/SPD
02:25 - 07:00 C Commissioning    / 
07:00 - 19:10 M Maintenance    / 
19:10 - 23:40 A Balser, D. LSC/S
23:40 - 24:00 C Commissioning    / 
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Friday   Friend Fe/Be
00:00 - 04:05 C Commissioning    / 
04:05 - 05:05 S Setup for GBT02A-012   L/P
05:05 - 07:00 A Balser, D. L/P
07:00 - 19:05 M Maintenance    / 
19:05 - 23:35 A Balser, D. LSC/S
23:35 - 24:00 C All sky pointing - Maddalena    / 
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Saturday   Friend Fe/Be
00:00 - 16:15 C All sky pointing - Maddalena    / 
16:15 - 17:15 S Setup for BA057   X/V
17:15 - 21:45 A Ghigo, F. D. X/V
21:45 - 22:45 S Setup for GBT02C-023   L/SPD
22:45 - 24:00 A Lockman, F. J. L/SPD
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Sunday   Friend Fe/Be
00:00 - 02:10 A Lockman, F. J. L/SPD
02:10 - 16:10 C All sky pointing - Maddalena    / 
16:10 - 17:10 S Setup for BA057   X/V
17:10 - 21:40 A Ghigo, F. D. X/V
21:40 - 22:40 S Setup for GBT02C-023   L/SPD
22:40 - 24:00 A Lockman, F. J. L/SPD
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Monday   Friend Fe/Be
00:00 - 02:05 A Lockman, F. J. L/SPD
02:05 - 07:00 C Commissioning    / 
07:00 - 19:05 M Maintenance    / 
19:05 - 24:00 T Tests Low Freq - Roshi    / 
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Tuesday   Friend Fe/Be
00:00 - 07:00 T Tests Low Freq - Roshi    / 
07:00 - 19:05 M Maintenance    / 
19:05 - 20:05 S Setup for GBT02B-021   L/B
20:05 - 23:05 A Ghigo, F. D. L/B
23:05 - 24:00 T Tests of Spectrometer modes - Hogg    / 
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Wednesday   Friend Fe/Be
00:00 - 07:00 T Tests of Spectrometer modes - Hogg    / 
07:00 - 19:00 M Maintenance    / 
19:00 - 20:00 S Setup for GBT02B-021   L/B
20:00 - 23:00 A Ghigo, F. D. L/B
23:00 - 24:00 C Commissioning    / 
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Thursday   Friend Fe/Be
00:00 - 07:00 C Commissioning    / 
07:00 - 18:55 M Maintenance    / 
18:55 - 23:10 A Balser, D. LSC/S
23:10 - 24:00 T Tests of polarization - Roshi    / 
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Friday   Friend Fe/Be
00:00 - 10:05 T Tests of polarization - Roshi    / 
10:05 - 16:20 T MV - QD Tests - Constantikes    / 
16:20 - 17:20 S Setup for BA057   X/V
17:20 - 20:50 A Ghigo, F. D. X/V
20:50 - 21:50 S Setup for GBT02C-023   L/SPD
21:50 - 24:00 A Lockman, F. J. L/SPD
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Saturday   Friend Fe/Be
00:00 - 02:50 A Lockman, F. J. L/SPD
02:50 - 07:50 C Commissioning    / 
07:50 - 16:20 T Tests of GBT02A-028 - RM/JB    / 
16:20 - 17:20 S Setup for BA057   X/V
17:20 - 21:50 A Ghigo, F. D. X/V
21:50 - 24:00 C Commissioning    / 
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Sunday   Friend Fe/Be
00:00 - 07:45 C Commissioning    / 
07:45 - 17:45 T Tests of polarization - Roshi    / 
17:45 - 18:45 S Setup for GBT02A-052   6LS/BP
18:45 - 22:45 A Ghigo, F. D. 6LS/BP
22:45 - 24:00 A Lockman, F. J. L/SPD
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Monday   Friend Fe/Be
00:00 - 02:40 A Lockman, F. J. L/SPD
02:40 - 07:00 C Commissioning    / 
07:00 - 18:55 M Maintenance    / 
18:55 - 19:55 S Setup for GBT02C-023   L/SPD
19:55 - 24:00 A Lockman, F. J. L/SPD
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Tuesday   Friend Fe/Be
00:00 - 02:35 A Lockman, F. J. L/SPD
02:35 - 07:00 T Tests using HI Galaxy Survey - Fisher/Norrod    / 
07:00 - 19:05 M Maintenance    / 
19:05 - 21:35 T Tests - Pointing checks Balser    / 
21:35 - 22:35 S Setup for GBT02A-038   L/S
22:35 - 24:00 A Maddalena, R. L/S
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Wednesday   Friend Fe/Be
00:00 - 07:00 A Maddalena, R. L/S
07:00 - 19:00 M Maintenance    / 
19:00 - 21:30 T Tests of Spigot card - Kaplan    / 
21:30 - 22:30 S Setup for GBT02A-038   L/S
22:30 - 24:00 A Maddalena, R. L/S
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Thursday   Friend Fe/Be
00:00 - 07:00 A Maddalena, R. L/S
07:00 - 19:00 M Maintenance    / 
19:00 - 21:30 T Tests of Spigot card - Kaplan    / 
21:30 - 22:30 S Setup for GBT02A-038   L/S
22:30 - 24:00 A Maddalena, R. L/S
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Friday   Friend Fe/Be
00:00 - 06:55 A Maddalena, R. L/S
06:55 - 13:40 T Spectrometer Tests - Prestage   L/SD
13:40 - 15:40 S Setup for GBT02A-021   LSC/S
15:40 - 22:40 A Balser, D. LSC/S
22:40 - 24:00 C Checks on GBT02A-021 - Balser    / 
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Saturday   Friend Fe/Be
00:00 - 01:20 C Checks on GBT02A-021 - Balser    / 
01:20 - 02:20 S Setup for GBT02A-062   L/B
02:20 - 03:20 A Ghigo, F. D. L/B
03:20 - 04:20 S Setup for GBT02A-012   L/P
04:20 - 06:20 A Balser, D. L/P
06:20 - 09:05 T Tests of 2B6 - Maddalena    / 
09:05 - 10:05 S Setup for GBT02C-034   8L/B
10:05 - 14:05 A Ghigo, F. D. 8L/B
14:05 - 15:05 S Setup for GBT02B-009   L/P
15:05 - 18:05 A Balser, D. L/P
18:05 - 19:05 S Setup for GBT02B-019   L/B
19:05 - 24:00 A Ghigo, F. D. L/B
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Sunday   Friend Fe/Be
00:00 - 03:00 A Ghigo, F. D. L/B
03:00 - 08:15 T Polarization tests - Roshi   P/L
08:15 - 16:15 T Tests of Spigot card - Kaplan    / 
16:15 - 17:15 S Setup for GBT01A-079   L/P
17:15 - 21:15 A Ghigo, F. D. L/P
21:15 - 22:15 S Setup for GBT02C-023   L/SPD
22:15 - 24:00 A Lockman, F. J. L/SPD
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Monday   Friend Fe/Be
00:00 - 02:10 A Lockman, F. J. L/SPD
02:10 - 07:00 T Tests using HI Galaxy Survey - Fisher/Norrod    / 
07:00 - 18:55 M Maintenance    / 
18:55 - 24:00 T Tests Low Freq - Roshi   8/ 
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Tuesday   Friend Fe/Be
00:00 - 07:00 T Tests Low Freq - Roshi   8/ 
07:00 - 19:10 M Maintenance    / 
19:10 - 21:40 A Lockman, F. J. L/SPD
21:40 - 22:40 S Setup for GBT02A-038   L/S
22:40 - 24:00 A Maddalena, R. L/S
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Wednesday   Friend Fe/Be
00:00 - 07:00 A Maddalena, R. L/S
07:00 - 19:05 M Maintenance    / 
19:05 - 21:35 A Balser, D. L/P
21:35 - 22:35 S Setup for GBT02A-038   L/S
22:35 - 24:00 A Maddalena, R. L/S
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Thursday   Friend Fe/Be
00:00 - 07:00 A Maddalena, R. L/S
07:00 - 17:30 M Maintenance    / 
17:30 - 18:30 S Setup for GBT02A-021   LSC/S
18:30 - 21:30 A Balser, D. LSC/S
21:30 - 22:30 S Setup for GBT02A-038   L/S
22:30 - 24:00 A Maddalena, R. L/S
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Friday   Friend Fe/Be
00:00 - 06:55 A Maddalena, R. L/S
06:55 - 12:55 T Spectrometer Tests - Prestage   L/SD
12:55 - 13:55 S Setup for GBT02C-023   L/SPD
13:55 - 24:00 A Lockman, F. J. L/SPD
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Saturday   Friend Fe/Be
00:00 - 01:50 A Lockman, F. J. L/SPD
01:50 - 09:05 T Polarization tests - Roshi   L/P
09:05 - 13:50 T Tests - Ghigo    / 
13:50 - 14:50 S Setup for GBT02A-060   L8/PS
14:50 - 22:50 A Ghigo, F. D. L8/PS
22:50 - 24:00 T Tests of 2B6 - Maddalena    / 
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Sunday   Friend Fe/Be
00:00 - 08:05 T Tests of 2B6 - Maddalena    / 
08:05 - 13:50 T Basline tests - Balser/Fisher    / 
13:50 - 14:50 S Setup for GBT02A-060   L8/PS
14:50 - 22:50 A Ghigo, F. D. L8/PS
22:50 - 24:00 C Pointing/QD checks - Prestage    / 
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  

Monday   Friend Fe/Be
00:00 - 24:00 C Commissioning    / 
00:00 - 07:00 C Pointing/QD checks - Prestage    / 
07:00 - 16:30 M Maintenance    / 
16:30 - 17:30 S Setup for GBT02C-023   L/SPD
17:30 - 23:00 A Lockman, F. J. L/SPD
23:00 - 00:00 T Tests - Prestage    / 
Codes: A-Astronomy, M-Maintenance, C-Commissioning, T-Tests, S-Setup, D-Shutdown, N-Notscheduled
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  


Jump to Schedules Page     GB Home Page     GBT Home Page     GBT Web Calendar

Generated by C.Bignell 09/30/2002