GBT VLBA PROJECT SETUP

Observer's Name: J.Lazio
Project ID: BL106
Receiver: Rcvr1_2
Center Frequency: 1420 MHz
Start Date/Time: Sun May 12 2002 15:30 UT
Number of tapes: 1
Tapes change times: -----
Glish setup script: BL106_setup_L.g
Receiver pol:
gain, phase, atten:
filter:
circular
x=+3, y= -6, phase=83.5
1.30-1.45 GHz
LO1 center F0:
phase cal?
1420 MHz
no

Signal Routing
Rcvr IFRack IF Filter Fiber Cnv.Rack Cnv.LO2 DAR channel
Rcvr1_2:XLA S1 2990-3010 1 A,CM1 12750 C
Rcvr1_2:YRB S3 2990-3010 3 A,CM5 12750 A

Checklist:
Project:
Download and setup files and scripts.
Check clocks.
Clean drives and mount tapes.
Start experiment.
Dismount and prepare tapes for shipping.
Ship tapes and enter them in TRACK.
Send e-mail to Socorro.