GBT VLBA PROJECT SETUP

Observer's Name: Colin Lonsdale
Project ID: GL026B
Receiver: Rcvr1_2
Stations: VLBA, VLA, GBT, Bonn, Joddrell, Westerbork, Torun, Noto, Medicina
Center Frequency: 1645 MHz
Start Date/Time: Sat Nov 16 2002 12:30 UT
End Date/Time: Sat Nov 16 2002 23:58 UT
Number of tapes: 2 (autoallocate)
Tapes change times: 18:22
Glish setup script: GVSETUP r1_2 tp 1645 1550 230 0 pcalon 0
Receiver pol:
gain, phase, atten:
filter:
circular
x=+3, y= -6, phase=83.5
1.6-1.75 GHz
LO1 center F0:
phase cal?
1550 MHz
yes

Signal Routing
Rcvr IFRack IF Filter Fiber Cnv.Rack Cnv.LO2 DAR channel
Rcvr1_2:XLA S1 2840-3160 1 A,CM1 12750 C
Rcvr1_2:YRB S3 2840-3160 3 A,CM5 12750 A

Notes:

--------------------
Nov 16, 2002
--------------------
Project GL026B has started at Green Bank.  Everything looks
ok so far.  The phase cal levels are 5-7% according to PCALX.
Weather is warm and cloudy with rain likely.

-- frank
--------------------