Observer's Name: | Colin Lonsdale |
Project ID: | GL026B |
Receiver: | Rcvr1_2 |
Stations: | VLBA, VLA, GBT, Bonn, Joddrell, Westerbork, Torun, Noto, Medicina |
Center Frequency: | 1645 MHz |
Start Date/Time: | Sat Nov 16 2002 12:30 UT |
End Date/Time: | Sat Nov 16 2002 23:58 UT |
Number of tapes: | 2 (autoallocate) |
Tapes change times: | 18:22 |
Glish setup script: | GVSETUP r1_2 tp 1645 1550 230 0 pcalon 0 |
Receiver pol:
gain, phase, atten: filter: |
circular
x=+3, y= -6, phase=83.5 1.6-1.75 GHz |
LO1 center F0:
phase cal? |
1550 MHz
yes |
Signal Routing
Rcvr | IFRack | IF Filter | Fiber | Cnv.Rack | Cnv.LO2 | DAR channel |
Rcvr1_2:XLA | S1 | 2840-3160 | 1 | A,CM1 | 12750 | C |
Rcvr1_2:YRB | S3 | 2840-3160 | 3 | A,CM5 | 12750 | A |
-------------------- Nov 16, 2002 -------------------- Project GL026B has started at Green Bank. Everything looks ok so far. The phase cal levels are 5-7% according to PCALX. Weather is warm and cloudy with rain likely. -- frank --------------------