Installing the final backup structure module.
Derrick is holding module 11R in place. This is module 20 out of 22 to be installed.
Derrick is holding module 11L in place. This is module 18 of 22 to be installed.
Installation of module 7L on to the box structure. This is module 14 of 22 to be installed.