Project: TBASERDN030522 5/22/2003 M&C Version: 3.13 Setting up again to test Converter Rack baseline ripple. Used setup file ~rnorrod/Gbt/TestCfgs/if_acs_crackA.cfg Using T=360s Setup began at 20:30 UT. Normal connections. 1 : SCAN STARTING AT 52781 20:47:33 to 9 : SCAN FINISHED AT 52781 21:44:35 Installed 6dB pads at all outputs of OR3. No change to OR1. Rebalanced spectrometer. 10 : SCAN STARTING AT 52781 21:49:53 to 19 : SCAN FINISHED AT 52781 22:52:04 Added another 6dB (total 12dB) to each output of OR3. No change to OR1. Removed 4dB from OD3 attenuator, and rebalanced spectrometer. 20 : SCAN STARTING AT 52781 22:56:52 to 27 : SCAN FINISHED AT 52781 23:46:34 Removed all pads, and terminated outputs of OR3, except B which is connected to CM6. 28 : SCAN STARTING AT 52781 23:52:25 to 37 : SCAN FINISHED AT 52782 0:54:36 Removed terminations and returned system to normal connections. 38 : SCAN STARTING AT 52782 0:57:53 to 42 : SCAN FINISHED AT 52782 1:28:55